Glossary

Terms are expanded at first use on each page. This page is the backstop, not a substitute.

LCOE
levelised cost of energy: the average cost per MWh of building and running a generator over its life.
BESS
battery energy storage system.
Firmed / 24×7 firm
power delivered continuously at a stated reliability (here 99%), not only when the sun shines; achieved by pairing solar with storage.
MWh / TWh
megawatt-hour; terawatt-hour (a billion times larger). Australia's east-coast grid consumes about 213 TWh a year.
NEM / WEM
the National Electricity Market (eastern states) and Wholesale Electricity Market (WA's main grid).
HVAC / HVDC
high-voltage alternating / direct current transmission.
Capacity factor
actual energy produced as a share of the theoretical maximum.
GHI
global horizontal irradiance: how much solar energy lands on a flat surface, in kWh/m² per year.
WACC
weighted average cost of capital: the blended financing rate a project pays.
IRR
internal rate of return.
RTT
round-trip time: how long data takes to travel to a location and back, in milliseconds.
PUE
power usage effectiveness: total data-centre power divided by computing power; lower is better.
SWRO
seawater reverse osmosis desalination.
FPIC
free, prior and informed consent: the standard for Traditional Owner agreement this project treats as Gate 0.
ILUA
Indigenous Land Use Agreement, a formal agreement under the Native Title Act.
NTRB / RATSIB
Native Title Representative Body; the map layer uses the formal term (Representative Aboriginal/Torres Strait Islander Body).
CAPAD
the national database of protected areas.
EPBC
the Environment Protection and Biodiversity Conservation Act, the Commonwealth environmental approval law.
REGO
Renewable Electricity Guarantee of Origin certificate.